Ouch

Brutal marathon painting session last night, after the floor guys left. But at least 99.9% of the walls in the great room are painted. We ran out of paint, upper body strength, and patience at about 10:30 last night, and still need to get the corners of the ceiling with a trim pad and touch up a few spots. All things considered, though, not bad for 4.5 hours and some 25-foot walls. (Cathedral ceiling = hard to paint room.) My arms may talk to me again in a few hours.